Over 460 signatures were obtained in less than a month, supporting the construction of the ‘missing link’ on Burwood Highway. These were handed to local MP Shaun Leane on 19 April.
Over 460 signatures were obtained in less than a month, supporting the construction of the ‘missing link’ on Burwood Highway. These were handed to local MP Shaun Leane on 19 April.